How high can aluminum scaffolding build?

With the increase of domestic labor costs and the improvement of safety awareness and control in recent years, more and more customers begin to choose aluminum alloy scaffolding products. But the grim reality is that in the absence of national standards and norms, aluminum scaffolding can be set up on the premise of absolute safety, which is a problem that many enterprises should carefully consider when choosing products. This paper will focus on the height of aluminum scaffolding.

 

This paper includes the following points:

What is the height of the aluminum scaffold?

What should the engineer consider when designing the height?

How to calculate if the erection height exceeds the specification?

 

What is the height of the aluminum scaffold?

Generally speaking, the height of aluminum scaffolding can be divided into three contents: platform height, working height and tower height.

Platform height refers to the height from the ground to the work platform (the platform on which the worker needs to stand).

The working height refers to the height from the ground where the hands of the construction personnel need to touch when working, which is generally higher than the height of the platform.

Tower height refers to the total height of the built aluminum alloy scaffold (casters to the highest point of the aluminum alloy scaffold).

The three heights have a fixed relationship: working height > tower height > platform height. So customers in the purchase of aluminum scaffolding should be clear about their requirements for the three heights, in order to choose the most suitable for their own products.

 

What should the engineer consider when designing the height?

According to the European Union en1004 standard, mobile working platforms over 12 meters high are very dangerous. According to the European Union en1004 standard, for mobile working platforms over 12 meters high, professional companies and engineers must sign and issue design documents, and be responsible for the safety and use of products for life. For the aluminum scaffolding exceeding the specified height, the following points should be paid attention to in the design:

1. Nonprofessionals can smoothly build and operate the products after simple training.

2. Reduce the fear of nonprofessionals.

3. Ensure that 2-3 people can easily move the tower.

4. The cost of the mobile aluminum alloy platform over 20 meters is very expensive, and the products should be guaranteed to be used for at least 20 years.

 

How to calculate if the erection height exceeds the specification?

1. First of all, the design calculation of the aluminum alloy scaffold must comply with the provisions of relevant specifications and be approved by the technical director of the enterprise.

2. When the erection height is 25m-50m, the galvanized square pipe should strengthen the overall stability of the scaffold from the structure.

3. When the erection height is more than 50m, the aluminum alloy scaffold can be strengthened by double vertical poles, unloaded by sections, or erected by sections.

4. The used height of aluminum alloy scaffold should be within a certain range to avoid potential safety hazards. If it exceeds a certain range of scaffold height, the corresponding height should be calculated to meet the height requirements of the construction team.

 

Golden Resource has our own design team who are with years of designing and manufacturing scaffolding products. We can set up the height to meet the requirements of customers under the condition of absolute safety. If you need, you can consult us.


Contact

  No.2 Haihui Road,Shuixi Village,Shuikou Town,Laian County,Chuzhou City,Anhui Province,P.R.China
  0550-5968666
  tinatina3881
  +8618951943535

Quick Links

Product

Join Our Newsletter

You can keep abreast of our latest information
All rights reserved  © 2020 Laian Golden Resource Metalwork Co.,Ltd  Support By Leadong