How to install aluminum planks?

A scaffolding system is usually a necessary part of building and house maintenance. It provides a larger platform for walking and setting up all tools than the ladder does. This greatly reduces working time. Properly set up scaffolding to ensure the safety of you and others who use the equipment is important and small negligence in erecting scaffolding can lead to serious accidents. Therefore, how to install the aluminum planks and the other components of the whole scaffolding system correctly? Please allow me to introduce that to you in the following contents.

 

Steps of installing the aluminum planks and other components.

The steps of installing the aluminum planks and other components to set up the whole scaffolding system are not so complicated. Generally, there are 8 steps, which are also listed as follows:


Step 1: Organize all parts

Before assembling the scaffold planks, frames, etc, keep all the parts in one place. Then place the two end stands on the ground near the area to be sprayed. With the ends facing each other, place the ladders on the same side and place their bases about 7 feet apart (or at the final width of the horizontal stand). Raise the feet of one stand and insert the long end of the adjustable screw rod into the feet. Then insert the rest of the rods into the rest of the feet.


Step 2: Assemble the base plate

Now install the base plate or casters so that you do not have to lift the assembled scaffold in the future. Different scaffold models may have different assembly methods, but most have open tubes that slide over the bottom of the adjustable screw rod. . Use braids, toggle pins, or the locking attachment provided with the scaffold to secure all base plates or casters. Lock the mechanism in place after sliding it into the holes.


Step 3: Assemble the crossbeam

Lift one end of the frame, unfold one cross brace, and slide the hole in the cross brace arm over the pin on the frame. Lock the pins and let the cross support the frame as you lift the second frame. Lift the second frame, slide the other end of the cross brace onto the pin and lock it. Repeat this process to assemble the other cross bracket and lock the pins.


Step 4: Lock and level

Move the scaffold to the position you want to use. On a soft surface, slide a 2x10 block under each floor or wheel. Lock the wheels and set a long straight 2x4 on the bottom bar of the end frame. use the adjustment screws to level the scaffold.


Step 5: Install the aluminum planks

Grasp the scaffolding aluminum plank in the middle, hang it over, tilt it at an angle, and then slide the aluminum plank over the top slide bar until its top end is over the bar. Level the aluminum plank and place it in the proper position so that the hooks engage the crossbars on the frame at each end. Then lower the aluminum plank until the hooks hang from the crossbars. Secure the aluminum plank with the swivel lock. Repeat these steps until you have installed all the aluminum planks correctly.


Step 6: Install the railings

Use the ladder side of the frame to transport the fence components to the platform of aluminum planks. Slide the guardrail posts onto the corner posts of each frame and secure them using the braids, toggle pins, or bolts that come with the scaffolding model. Install the top and bottom railings between the posts.


Step 7: Prepare the workstations

Install the workstation on the scaffold platform by carrying the required items up a ladder or placing these items in a large bucket and dragging them with a rope. Having all the items you need ready to go at all times before you start will reduce your prep work and painting time to an amazing degree. It's not just that painting will be faster. Scaffolding is much easier than a ladder.


Step 8: Avoid hazards

Avoid working on scaffolding around power lines. If there are power lines near the work area or in the workflow, take extra care to keep them overhead when moving the scaffold. Do not assume that the scaffold will always move on a horizontal line. Changes in the ground can cause the scaffold to tilt, thus bringing the metal frame into contact with the power line above the scaffold. If the framed scaffold assembly does not allow you to paint without rthe isk of electrocution, you can use a ladder jack to get you close to the house, but away from the power lines. Otherwise, a separate fiberglass ladder will slow down your work but will keep you safe.

 

If you are looking for more information concerning how to install aluminum planks or are interested in finding professional aluminum plank manufacturers to buy wonderful types of them. Then, you have turned on the right passage, please make sure you check out the web of Laian Golden Resource Metalwork Co., Ltd, this professional laser machine manufacturer will definitely satisfy any orders and needs of you with their reliable and professional knowledge and their amazing production speed.

 


Contact

  No.2 Haihui Road,Shuixi Village,Shuikou Town,Laian County,Chuzhou City,Anhui Province,P.R.China
  0550-5968666
  tinatina3881
  +8618951943535

Quick Links

Product

Join Our Newsletter

You can keep abreast of our latest information
All rights reserved  © 2020 Laian Golden Resource Metalwork Co.,Ltd  Support By Leadong