How to install ring lock scaffolding quickly?

Publish Time: 2021-12-01     Origin: Site

The ringlock scaffolding system is a modular scaffolding system made of prefabricated components. It consists of standard, ledger, adapter, and diagonal brackets, which can be connected vertically and horizontally. Therefore, the speed of installation of a ringlock scaffolding system is quite important for the whole project. So, how to install ringlock scaffolding systems quickly and correctly? Please let me introduce that to you in the following contents.


l Here is the content list:

l The installation steps.

The installation steps.

The installation and removal of ringlock scaffolding can only be performed by personnel with the necessary professional knowledge. During installation, use, and disassembly, damaged scaffolding components must not be used, but must be replaced with non-defective components. Warn of wind, snow, and ice. For wind loads on unprotected scaffolding, wall anchors must be installed every four meters and approved expansion bolts with checked tensile forces must be used as close as possible to the beam. The assembly of the intersection is the key part of the installation. The tried-and-tested wedge locking principle has been selected as the connector. In this way, with loosely inserted wedges, the scaffold has reached its fixed angle of 90°. Hammering to the wedge creates a firm locking position. The upper and lower contact surfaces of the tip are pressed against the standard pipe, thus forming a very strong connection. The wedge lock on the ledger moves laterally on the collar. The wedge is located at the top of the ledger, which is secured by rivets on the top. Install the wedge into a hole in the collar and hammer the wedge to ensure a firm connection. There are four small holes at 90° to each other on the collar. When a precise right angle is required, connect the adapter and ledger here. These are automatically set when wedging. The elongated holes are located between the small holes, which allow the adapter to be connected at 45 degrees plus or minus 15 degrees. This means that structures that are not constrained by the 90-degree distance can be manufactured. An example is a signature scaffolding with an equilateral triangle layout and the structure around an oil storage tank. Using two adapters can achieve all angles between 45 degrees and 15 degrees. After knowing how to assemble the intersections, then it is time to know how to set the bottom of the ringlock scaffolding system. The pair of base jacks should maintain a certain distance both in the longitudinal direction and the transverse direction. You can check the distance by placing a ledger along the object to be processed. Start the installation on the highest possible ground. Any ground slope that requires fine-tuning of the scaffolding and its height, the maximum distance of the mandrel in the foundation jack should be 50 cm. The maximum dimensional force from the base jack is 2.5 kN (approximately 2.500 kg). If necessary, you must place suitable wooden boards underneath to cover the internal and external standards as much as possible to evenly distribute the load. If the plank is not level, wedge supports must be used. If the ground has been excavated and refilled, it needs to be packed to ensure the foundation is stable. The foundation collar is inserted into the threaded foundation socket and connected with a ledger and beam. Before fixing the wedge, you need to use a level to check the horizontal alignment of the scaffold. After wedging, the bottom layer is precise, now that it is complete, you can now start building upwards. After setting the bottom of the ringlock scaffolding systems right, the next thing to do is to build the vertical structure. Steps are listed as follows: Screw the vertical standard wire to the base collar. Fit the beam and ledger to the next platform. The maximum distance between platforms is 2 m. Select the beam for the current panel. Use tail plates and ledgers with U-shaped adapter profiles for steel decks, aluminum decks, or combined decks. Use a deck lock to lock the deck to prevent accidental lifting. When using the console bracket, longitudinal beams (ledger or padded deck) must be installed or covered in other ways in the space between the main level and the bracket level.


If you are looking for more information concerning ringlock scaffolding systems or are interested in finding professional ringlock scaffolding system manufacturers to buy wonderful types of them. Then, you have turned on the right passage, please make sure you check out the web of Laian Golden Resource Metalwork Co., Ltd, this professional laser machine manufacturer will definitely satisfy any orders and needs of you with their reliable and professional knowledge and their amazing production speed.


Contact

  No.2 Haihui Road,Shuixi Village,Shuikou Town,Laian County,Chuzhou City,Anhui Province,P.R.China
  0550-5968666
  tinatina3881
  +8618951943535

Join Our Newsletter

You can keep abreast of our latest information
All rights reserved  © 2020 Laian Golden Resource Metalwork Co.,Ltd  Support By Leadong