What are the aspects of cuplock scaffolding and ringlock scaffolding erection?

Publish Time: 2021-11-29     Origin: Site

During the development of building construction and innovation of technical technology, the drawbacks of traditional scaffolding are gradually emerging under the development of construction projects. For example, poor safety protection, low construction efficiency, and limited building height, all of which cannot meet the construction requirements of high-rise buildings. Now, modular scaffolding systems such as cuplock scaffolding and ringlock scaffolding have been gradually replacing the role of traditional scaffolding because of their premium quality and revolutionary technical advantages. So, what are the aspects or steps of the erection of cuplock scaffolding systems and ringlock scaffolding systems? Please let me introduce them to you in the following contents.


Here is the content list:

l What are the erection steps of the ringlock scaffolding systems?

l What are the erection steps of the cuplock scaffolding systems?

What are the erection steps of the ringlock scaffolding systems?

The erecting procedures of ringlock scaffolding systems are quite simple. The first step: Set the basic jack on the ground according to the design size. If the ground is uneven, try to adjust the base jack nut to the same level, then install the foundation collar on the nut of the foundation jack. The second step: Connect the collar of the base through the bottom ringlock account book. Connect the horizontal end to the small hole in the rosette. Use a level to check that all bottoms are on the same horizontal line. If not, adjust the reference jack until the horizontal line is on the same horizontal line. The bottom level should not be 550 mm higher than the ground. After that, install the vertical wire on the foundation collar. Install other spirit levels horizontally. The third step is to install the diagonal brace at the corresponding position according to the drawing. Connect the end of the diagonal brace to the large hole in the rosette, then install the scaffolding board. The fourth step of ringlock scaffolding systems erection is to install the stairs, which is quite simple. After all those four steps, the installation of a single module of the ringlock scaffolding system is done. If necessary, you can extend the scaffolding by repeating steps 2, 3, and 4.


What are the erection steps of the cuplock scaffolding systems?

The installation of cuplock of scaffolding systems maybe even easier. Steps are listed as follows:

First, place the standard on a base plate that can support the load without sinking above the level and on firm ground. Then, set up the initial lift. Before installing subsequent lifts, please securely fix all connections. Make sure that all platforms are covered with wooden boards, with a minimum width of 460 mm. Next, install guardrails on all open sides, remember to provide sufficient accessibility for ladders, stairs, ramps, and sidewalks as needed. Finally, install debris nets to protect personnel from debris and other falling objects.

If you are looking for more information concerning ringlock scaffolding systems or are interested in finding professional ringlock scaffolding system manufacturers to buy wonderful types of them. Then, you have turned on the right passage, please make sure you check out the web of Laian Golden Resource Metalwork Co., Ltd, this professional laser machine manufacturer will definitely satisfy any orders and needs of you with their reliable and professional knowledge and their amazing production speed.


Contact

  No.2 Haihui Road,Shuixi Village,Shuikou Town,Laian County,Chuzhou City,Anhui Province,P.R.China
  0550-5968666
  tinatina3881
  +8618951943535

Join Our Newsletter

You can keep abreast of our latest information
All rights reserved  © 2020 Laian Golden Resource Metalwork Co.,Ltd  Support By Leadong